This article provides relevant guidelines and precautions for the disassembly and assembly of the A1 Y-axis assembly, removing the Y-axis assembly from the Bottom Base and reinstalling it is not included.
Warm reminder: There will be lubricating oil on theY-axis Linear Rail, so it is recommended to wear gloves when operating.
The following are the spare parts involved in this guide.
No. | Descriptions | Pictures | NO. | Descriptions | Pictures |
1 | Y Belt | 2 | Y Motor |
|
|
3 | Y-Axis Tensioner |
|
4 | Y-Axis Track Bearing | |
5 | Y-axis Linear Rail |
|
|||
None
Model | Locations | Dimensions/Drawing | Model | Locations | Dimensions/Drawing | ||
Screw A |
B0023 |
Belt fixing plate 4PCS |
|
Screw B |
B0063 |
Y tensioner /Y motor/ Spring hook 4PCS+4PCS+2PCS |
|
Screw C |
B0039 |
Y tensioning screw 2PCS |
|
Screw D |
B0011 |
Y Motor 4PCS |
|
Screw E |
B00250 |
Y-Axis Track Bearing 4PCS |
Screw F |
B00267 |
Track bearing adjustment 2PCS |
H2.0 Hex Key
Cross screwdriver
Flat tweezers
Please refer to the A1 Bottom Base Installation Tutorial for the details of removing and installing the Y-axis assembly from the Bottom Base.
IMPORTANT!
It's crucial to power off the printer before performing any maintenance work on the printer and its electronics, including tool head wires, because leaving the printer on while conducting such tasks can cause a short circuit, which can lead to additional electronic damage and safety hazards.
When you perform maintenane or troubleshooting on the printer, you may be required to disassemble some parts, including the hotend. This process can expose wires and electrical components that could potentially short circuit if they come into contact with each other or with other metal or electronic components while the printer is still on. This can damage the electronics of the printer and cause further damage.
Therefore, it's essential to switch off the printer and disconnect it from the power source before doing any maintenance work. This will prevent any short circuits or damage to the printer's electronics. By doing so, you can avoid potential damage to the printer's electronic components and ensure that the maintenance work is performed safely and effectively.
If you have any concerns or questions about following this guide, open a new ticket in our Support Page and we will do our best to respond promptly and provide you with the assistance you need.
Release the tensioning spring and loosen the 2 tensioning screws with an H2.0 hex key (Loose 1 turn);
Remove 4 screws with an H2.0 hex key, remove the 2 belt fixing plates, and remove the Y Belt.
Remove 4 screws with an H2.0 hex key and then remove the Y Tensioner;
Remove 2 screws with an H2.0 hex key and then remove the spring hook.
|
|
Remove 4 screws with an H2.0 hex key and then remove the Y Motor
Remove 4 screws with an H2.0 hex key and then remove the Y motor holder.
Remove the heatbed bracket from one end of the Y-axis Linear Rail;
Remove 1 screw and the Y-Axis Track Bearing (The method of removing the 4 Y-Axis Track Bearings is the same)
|
Please note that set a large torque for the 4 screws, and screws come with screw glue. Be careful to prevent the nut from slipping.
Install the Y-Axis Track Bearing under the heatbed bracket and tighten the screws (The method of installing the Y-Axis Track Bearing is the same)
Install the heatbed bracket onto the Y-axis Linear Rail. You need to check the installation direction
Note: When replacing the new Y-axis guide rail, it is necessary to apply lubricating oil to the guide rail for lubrication before installation.
Install the Y motor holder and lock in 4 screws;
Install the Y motor, the motor cable should be face downwards, and lock in the 4 screws.
Install the torsion spring holder, you need to the direction of the hook
Install the Y-axis Tensioner and lock in 4 screws.
Check the direction of the Y Belt, put the longer end of the tooth surface downward, and start threading the belt from the end of the Y tensioner;
Pushing and holding the movable part of the tensioner toward the rail allows the belt to pass through the idler pulley more easily;
Connect both ends of the Y Belt to the heatbed bracket, install the fixing plate, and lock in 2 screws on each plate to secure them.
Move the heatbed bracket to confirm that it moves smoothly, and install the tensioning torsion spring on the torsion spring holder
1. Move the heatbed bracket and confirm that the Y movement is smooth and the resistance is uniform;
2. Check the direction of the Y motor cable, the outlet cable is facing downward.
Note: If there is abnormal resistance on moving the heatbed bracket after installing the Y pulley bearing, you can adjust it by loosening the adjusting screw and the Y pulley bearing screw on the same side, and turning the adjusting plate.
None
We hope that the detailed guide we shared with you was helpful and informative.
We want to ensure that you can perform it safely and effectively. If you have any concerns or questions regarding the process described in this article, we encourage you to reach out to our friendly customer service team before starting the operation. Our team is always ready to help you and answer any questions you may have.
Click here to open a new ticket in our Support Page.
We will do our best to respond promptly and provide you with the assistance you need.